IRAN - C.I.S. RAILWAY LINK
The Sarakhs - Tajan Rail Link was officially opened on 13th May 1996, connecting the Iranian Southern Ports and entire Iranian Railway Network to C.I.S. destinations.
Operational Scheme
Due to the difference between the C.I.S. and Iran rail gauges, axles of wagons are changed at Sarakhs. Facilities for axle change is in place.
Iranian Rail Gauge is: 1435mm - C.I.S. Rail Gauge is: 1524mm
Rates and Tariffs
Iran joined the C.I.S. Unified Tariff Scheme from the outset. There were a few variations in the scheduling coefficients and exchange factors which Iran enforced in its tariffs. However, Iran presently observes the following Unified terms, conditions and factors.
C.I.S. Railway Wagon Specifications
|
Loading
Dimensions
|
||||
Type |
No.
of Axles
|
Loading
Capacity
|
Length
|
Width
|
Height
|
Boxed |
4
|
68
tons
|
15.800
|
2.700
|
3.200
|
Boxed |
4
|
64
tons
|
15.200
|
2.700
|
2.500
|
Sided |
4
|
64
tons
|
18.520
|
2.740
|
-
|
Flat Skeletails |
4
|
64
tons
|
18.700
|
2.740
|
-
|
Flat Wooden Base |
4
|
64
tons
|
18.560
|
2.760
|
-
|
Restrictions
Maximum tunnel height enroute: | 4.8 metres |
Minimum height of wagon platform from rail track: | 1.1 metres |
Maximum indivisible load width/height proportion
Width
|
Height
|
Width
|
Height
|
Width
|
Height
|
||
3100
|
1400
|
2700
|
2200
|
2300
|
2820
|
||
2900
|
1800
|
2500
|
2600
|
2100
|
3040
|
||
2800
|
2000
|
2400
|
2710
|
2000
|
3150
|